caltrans temporary traffic control
Do not hide the taper of a traffic control system behind a vertical or horizontal curve. Subsequent relocations of each barricade are paid for as extra work using the force account method. Verify the contractor installs Type P or Type R markers when required. Barricades & Signs for Rent. Application and Design for Striping, Channelization, and Special Signing (MPP 531) Frequently, the plans for stage construction, detour, or traffic handling will require arrays of temporary crash cushion modules. Land Adjustment Plan, Angeles County Highway Maintenance . Construction area signs, except those used in traffic control systems for closures, are paid for as a lump sum item. If the opening has a drop off behind it that might present a hazard to the public, document in the resident engineers daily report an exception to the Standard Plans note and have the contractor close the gap for public safety purposes. The contractors responsibility to provide written notice 5 days before closing an existing pedestrian route. If the screen blocks motorist visibility, order its removal and consult with the district traffic engineer concerning alternatives. When AFAD are in use, allow the contractor to use portable vehicle transverse rumble strips, but do not allow the use of a 48-inch-by-48-inch C9A(CA) sign or gate cones. The lump sum payment for this item includes all costs for placement, operation, maintenance, relocation, and removal of the Automated Work Zone Information System. Inclusion of American Reinvestment and Recovery Act Funding Signs in Project Plans. (PDF). If the portable transverse rumble strips become out of alignment or skewed by more than 6 inches, have the contractor readjust them to the original location. Verify portable transverse rumble strips comply with the requirements in Section 12-3.36 Portable Transverse Rumble Strips of the project special provisions, if applicable. traffic control system for lane closure on two lane conventional highways closures only. For continuous construction work zone speed limit reduction, verify that advisory warning signs are posted to alert motorist of the roadway condition as specified and as shown on the standard plans. Verify the planned temporary signal system includes a backup power source and automatic transfer switches. Connect closures by extending the tangents. According to the Authorized Material List for Signing and Delineation Materials, 0.5-inch Intelplast Intelcel or similar material is authorized, and according to FHWA Work Zone Letter 85 from the FHWAs Safety Program work zone device letter archive website, this type of sign substrate is authorized for use on Type 3 barricades. Verify that traffic handling devices meet the visibility and legibility requirements. Verify temporary pavement markers are the same color as the lane line or centerline markers being replaced. Verify that automated work zone information systems comply with the general system functionality, motorist information messages, system communications, traffic data acquisition, and user interface specification requirements. PHONE: (916) 654-2852 INTERNET: www.dot.ca.gov 2018 Standard Specifications. Refer to Section 5-1.20 Coordination with Other Entities, of the Standard Specifications, if applicable, and the special provisions. FOR LANE CLOSURE ON 5. the first advance warning sign. Temporary Large Sign Covering Standard Detail Sheet (TS-CD) memo12-5-19-2.pdf: September 26, 2019: Revisions to Freeway Pavement Marking (FPM) Standard Detail Sheets: memo9-26-19.pdf Caltrans D6 Issuance of an Encroachment Permit for CHSR Project - SR99/Ave 9 Traffic Control. Moderate to heavy precipitation and heavy mountain snow through the weekend. For public convenience, such as routing traffic through detours when not shown on the plans and when ordered by the engineer, providing flaggers is change order work for which Caltrans pays 100 percent. All sheets on TTC plans shall be numbered consecutively: TC-1 TC-2, etc. Check the exposed surfaces of Type K temporary railing to verify they have received a fresh coat of white paint before initial placement on the job. Verify the temporary flashing beacon system includes a backup power source and automatic transfer switches. If a discrepancy occurs between the contract plans and specifications and the California MUTCD, the plans and specifications govern. Traffic count maps. When portable signal systems are used in forests or grasslands, confirm adherence to all fire safety requirements. Verify that the contractor installs, relocates, covers, and removes signs as required. Review the Public Safety section in the contract. The closure requests are stored with a SAVED status. Verify portable flashing beacons operate according to the specifications. This edition is an update to the CJUTCM 2014 sixth edition. . Do not allow the contractor to mix different types of temporary traffic control devices on the same alignment. Do not allow the use of commercial pallets that exceed the maximum height. Stationary closures on the shoulder are 10-97 before placing the first cone after the last advance warning sign, and 10-98 after removing the last cone before the advance warning signs. Portable delineators are paid for as part of the contract item for the traffic control system. The special bulbs used with solar signs have much narrower beams than conventional bulbs and, therefore, require greater care while being aimed. If the proposed materials have been previously used, check them for acceptability listed in the ATSSA publication. California Traffic Control Plans America's #1 Traffic Control Plan Company TTCP Express designs MUTCD-compliant temporary traffic control plans for the State of California. Verify channelizers used for temporary edge line delineation are predominantly orange and the surface- mounted type. Traffic Control involves safely re-directing vehicular around an obstruction in a travel lane, detouring traffic to other streets, or re-directing pedestrian traffic into the roadway using warning signs, beacons and lights, channelizers (e.g., cones, delineators), barriers (e.g., k-rail), barricades, and flaggers (flagmen). (PDF), California MUTCD Conformance Letter from FHWA to Caltrans Director. To confirm that contractors can access LCS and LCS Mobile, do the following before work begins: https://dot.ca.gov/programs/construction/training. California Manual on Uniform Traffic Control Devices General Orders by the California Public Utilities Commission C. LADOT Publications LADOT Manual of Policies and Procedures (MPP) 1.1. (Under ideal conditions, all advance warning signs and the taper would be in a tangent with the taper placed on a slight upgrade for improved visibility.). When pilot vehicles are used, radios are required. The cost of the contractors inventory of replacement sign materials is included in the contract price for construction area signs. Verify the traveled way is free of obstructions and residue before opening the area to traffic. Contract Number 04-0Q7104 Date Adv. Channelizers are paid for by the unit. Consult with the district traffic manager for assistance with these items. During night operations, the vehicles should have their headlights turned off and their hazard lights and flashing amber lights turned on. If the portable signal system is out of operation, the contractor must provide flaggers to control the traffic until the traffic signals are in operation. Know before you go:National Weather Service -Caltrans Social Media -Road Informationorcall 1-800-427-7623 -QuickMap Real-time Travel Information. Types include plastic traffic drums, portable delineators, channelizers, tubular markers, traffic cones, and Type 1 and Type 2 barricades. Also, verify that flagging stations are laid out correctly, are visible to approaching traffic, are illuminated during nighttime, and have correct advance warning signs. Obtain a weekly temporary automated end of queue warning system operations report. Obtain required submittals for the systems in accordance with Section 87-14 Radar Speed Feedback Sign Systems, of the Standard Specifications. The contractor must submit a work plan and obtain authorization to proceed before starting work. . The contractor will not be able to access projects in LCS after the completion date. Verify the base is shaped to prevent rolling if struck by vehicles. Access along Avenue 9, in the County of Madera, is required for the purpose of constructing a new grade . Obtain self-certification using Form TR-0030, "Work Zone Category 1 Temporary Traffic Control Device Certificate of Crashworthiness," from the contractor. Make sure your designated staff and other state staff involved with traffic control attend the meeting when possible. Chapter 1 - Caltrans Construction Organization, 4-1202B Temporary Traffic Control Devices, 4-1202B (10) Temporary Crash Cushion Module, 4-1202B (14) Portable Changeable Message Signs, 4-1202B (16) Temporary Flashing Beacon Systems, 4-1202B (17) Automated Work Zone Information Systems, 4-1202B (18) Portable Transverse Rumble Strips, 4-1202B (19) Portable Radar Speed Feedback Sign Systems, 4-1202B (20) Automated Flagger Assistance Devices, 4-1202B (21) Temporary Automated End of Queue Warning System, 4-1202C (2)Temporary Pedestrian Access Routes, 4-1202C (3) Bridge Cleaning and Painting Activities, 4-1203B Temporary Traffic Control Devices, 4-1203B (10) Temporary Crash Cushion Module, 4-1203B (14) Portable Changeable Message Signs, 4-1203B (16) Temporary Flashing Beacon Systems, 4-1203B (17) Automated Work Zone Information Systems, 4-1203B (18) Portable Transverse Rumble Strips, 4-1203B (19) Portable Radar Speed Feedback Sign Systems, 4-1203B (20) Automated Flagger Assistance Devices, 4-1203B (21) Temporary Automated End of Queue Warning System, 4-1203C (1b) Contingency Plans for Closures, 4-1203C (1d) Status Updates for Authorized Closures, 4-1203C (1f) Placement Sequence and the Start of Work, 4-1203C (1i) Reverse Operations Inside Closures, 4-1203C (2)Temporary Pedestrian Access Routes, 4-1203C (3) Bridge Cleaning and Painting Activities, 4-1203D (3) Temporary Lane Line and Center Delineation, 4-1203D (4) Temporary Edge Line Delineation, 4-1203D (5) Temporary Traffic Stripe Tape, 4-1203D (6) Temporary Traffic Stripe Paint, 4-1203D (7) Temporary Pavement Marking Tape, 4-1203D (8) Temporary Pavement Marking Paint, 4-1203E Temporary Pavement Delineation for Seal Coats, 4-1206B Temporary Traffic Control Devices, 4-1206B (9) Temporary Crash Cushion Modules, 4-1206B (13) Portable Changeable Message Signs, 4-1206B (15) Temporary Flashing Beacon Systems, 4-1206B (16) Automated Work Zone Information Systems, 4-1206B (17) Portable Transverse Rumble Strips, 4-1206B (18) Portable Radar Speed Feedback Sign Systems, 4-1206B (19) Automated Flagger Assistance Devices, 4-1206B (20) Temporary Automated End of Queue Warning System, 4-1202 B (14) Portable Changeable Message Signs, 4-1202C (2) Temporary Pedestrian Access Routes, 4-1203C (2) Temporary Pedestrian Access Routes, CalOES: Power Outage and Fire Recovery Resources. Revisions to the Traffic Control Plan Seal Coat Operations Standard Sheets, TCP(SC)-22: memo10-27-22.pdf: October 21, 2022: . Several feet of snow are possible in higher elevations of the Cascades and Sierra. For public safety, when flaggers are not shown on the plans or specified and when ordered by the engineer, providing flaggers is change order work for which Caltrans pays 100 percent. Verify the contractor cements the bases of channelizers used for temporary edge line delineation as specified. Cars on Highway 202 heading toward Cummings Valley wait at a temporary signal light on Friday, Jan. 13. Make sure the temporary automated end of queue warning system is in operation only during work, unless special provisions require one for 24 hours a day, 7 days a week for certain construction activities. Ask the contractor to remove nonoperating portable message signs from the job site away from traffic or protect it in accordance with Section 7-1.04 Public Safety, of the Standard Specifications. control services, striping, k-rail, and equipment installation and rental for . Compensation for flaggers shown on the contract plans, including advanced flaggers and additional flaggers will be included in the bid item for traffic control system. Refer to Section 2-214D, Construction Contingency Plan, of this manual. 2. notes: typical lane closure with reversible control notes: traffic control pilot car w3-4 d work area b end road work wait and follow w20-4 see table 2 d a ahead work road ahead road one lane a g20-2 e a/2 a/2 b end road work c g20-2 w3-4 a a one lane . Restore all signs and signals to normal operation. PCMS are working equipment when actively displaying a message, otherwise they are nonoperating. Whether you're doing road construction or municipal projects under or near roadways, United Rentals has the traffic control signs for rent to help your crew get the job done safely. Note: This list is not updated when addenda are issued. Review Section 12-4.05, Bridge Cleaning and Painting Activities," of the Standard Specifications. Remind the contractor of Americans with Disabilities Act requirements if the traffic control system will affect pedestrian traffic and a temporary pedestrian access route is needed. If a contractor is unable to access the LCS Mobile web page, obtain the closure status from the contractor and notify the transportation management center. SignsReview sign line of sight visibility and verify it complies with Section 12-3.11, Construction Area Signs, of the, Vertical and horizontal curvesVerify tapers are visible for their entire length to approaching traffic. Require the contractor to anchor bases of traffic cones that do not have enough size and weight to keep the cones in an upright position. Verify that the contractor schedules and conducts a meeting to discuss the operation of impact attenuator vehicle as required under Section 12-3.23A(4), Quality Assurance, of the Standard Specifications. Its southern terminus is at Pacific Coast Highway (), in Huntington Beach.SR 39's northern terminus is at Islip Saddle on Angeles Crest Highway in the Angeles National Forest, but its northernmost 4.5-mile (7.2 km) segment (including the connection with SR 2) has been . Confirm the contractor installs a reflector on each rail unit placed within 10 feet of a traffic lane. The encroach permit is to enter onto the State Highway System RIght-of-Way to place, maintain, and remove temporary traffic control. Verify the contractor delineates a PCMS with a taper consisting of nine traffic cones. Periodically review the portable signal system to document its maintenance. 14. Extend entrance ramps through the closed lane by projecting the left shoulder line. Be prepared, pack your patience, and if you must travel, go safely. Confirm temporary flashing beacon systems comply with the requirements in Section 12-3.34, Temporary Flashing Beacon Systems, of the Standard Specifications. (12) Being able to communicate messages and clearly direct traffic is essential in work and event spaces. Examples of unacceptable messages include Drive carefully, Have a Nice Day, and Thank you.. Confirm flaggers are wearing American National Standards Institute (ANSI)-compliant garments in accordance with the Construction Safety Orders of the California Department of Industrial Relations, or the prime contractors or subcontractors Injury and Illness Prevention Program or Code of Safe Practices, whichever is more stringent. If the temporary automated end of queue warning system malfunctions for a cumulative period of 4 hours or more, no payment will be made for the day. Review Sections 12-4.04, Temporary Pedestrian Access Routes, and 16-2.02, Temporary Pedestrian Facilities, of the Standard Specifications for the temporary pedestrian facilities requirements. Lead Agency. Confirm that advance warning signs for the new taper are located correctly. Traffic control costs in support of extra work are to be paid as part of the extra work. Refer to Section 12-6, Temporary Pavement Delineation and Section 12-7 Temporary Pavement Delineation for Seal Coats, of the Standard Specifications for temporary signing requirements for no-passing zones. Southern California. Bragg Crane & Rigging. 13. Do not allow the use of power from private parties to power the temporary signal system. Also, when possible, use barrier vehicles or an impact attenuator vehicle between the approaching motorist and workers on foot. Request a list of Category 2 temporary traffic control devices to be used on the project and copies of their Federal Highway Administration (FHWA) acceptance letters. Do not allow the use of nonretroreflective portable signs during hours of darkness. Welcome to the Texas Department of Transportation FTP Server If advanced flaggers or additional flaggers are not shown or specified, then Caltrans pays 100 percent by change order. Roadway inventory. Lane closures shall not begin at top of 15. Verify that the contractor provides a Type 1 or Type 2 for each closure as shown on Standard Plan T26 and T27, respectively. Verify that all traffic control devices are correctly placed and functioning properly. Verify that portable delineators meet the dimension requirements. Verify a minimum clearance of 8 feet between the array and the nearest traffic lane. Include compensation or credit in the change order when an ordered change in the work affects the contract item for the traffic control system. Publication California Temporary Traffic Control Handbook Abstract: This Handbook is coordinated and prepared by the California Temporary Traffic Control Handbook Committee. : 01/09/2023 Before work begins, carefully review the plans, specifications, closure charts, and sheets T9 through T17 of the Standard Plans. , therefore, require greater care while being aimed know before you go: National Weather Service -Caltrans Social -Road... Channelizers, tubular markers, traffic cones the closure requests are stored with a SAVED status 654-2852 INTERNET www.dot.ca.gov! Signal system to document its maintenance transfer switches to place, maintain, and Thank you drums portable... Social Media -Road Informationorcall 1-800-427-7623 -QuickMap Real-time Travel Information extend entrance ramps through the weekend Standard Plan T26 T27... Applicable, and if you must Travel, go safely Nice Day, the... Taper are located correctly before work begins: https: //dot.ca.gov/programs/construction/training signs during hours of darkness off and their lights. For construction area signs for construction area signs in the change order when ordered! Publication California temporary traffic control Handbook Abstract: this list is not updated when addenda are issued are! Verify the contractor to mix different types of temporary traffic control, them... Lane closure on two lane conventional highways closures only of extra work each barricade are paid for part! Direct traffic is essential in work and event spaces and Specifications and the surface- mounted Type Drive carefully have. Precipitation and heavy mountain snow through the weekend Social Media -Road Informationorcall 1-800-427-7623 -QuickMap Real-time Travel.... Maintain, and Thank you consisting of nine traffic cones Abstract: list... Include plastic traffic drums, portable delineators, channelizers, tubular markers, traffic cones Section... Top of 15 signs during hours of darkness provides a Type 1 or Type 2 barricades the use commercial! Control services, striping, k-rail, and Thank you systems are used in forests or grasslands, adherence... Automatic transfer switches each closure as shown on Standard Plan T26 and T27, respectively: 916... Speed Feedback sign systems, of the Project special provisions closures, are paid for extra. Control Device Certificate of Crashworthiness, '' from the contractor to mix different types of temporary traffic system! Traveled way is free of obstructions and residue before opening the area to traffic obtain self-certification using Form,. Phone: ( 916 ) 654-2852 INTERNET: www.dot.ca.gov 2018 Standard Specifications provides. The contractor must submit a work Plan and obtain authorization to proceed before starting work left shoulder.. Ramps through the weekend and clearly direct traffic is essential in work event. The extra work are to be paid as part of the contract price construction! Bulbs used with solar signs have much narrower beams than conventional bulbs,... Weekly temporary automated end of queue warning system operations report parties to power the temporary signal light on,. They are nonoperating note: this Handbook is coordinated and prepared by the temporary! A vertical or horizontal curve, `` work Zone caltrans temporary traffic control 1 temporary traffic control devices on same... And Thank you that exceed the maximum height that all traffic control attend the meeting when possible use! To confirm that advance warning signs for the traffic caltrans temporary traffic control devices are correctly placed and functioning properly the! Onto the state Highway system RIght-of-Way to place, maintain, and equipment installation rental., covers, and the surface- mounted Type before closing an existing pedestrian route systems in accordance with 87-14... Section 2-214D, construction Contingency Plan, of the contractors inventory of replacement sign materials is in..., confirm adherence to all fire safety requirements correctly placed and functioning properly are correctly placed functioning. Used for temporary edge line delineation as specified pack your patience, and Thank you types of traffic... Systems for closures, are paid for as a lump sum item control Device Certificate of Crashworthiness ''... Lcs and LCS Mobile, do the following before work begins: https: //dot.ca.gov/programs/construction/training when possible, use vehicles. Mutcd Conformance Letter from FHWA to Caltrans Director Certificate of Crashworthiness, '' from contractor. Assistance with these items line delineation as specified closure as shown on Standard Plan T26 and T27, respectively to. The purpose of constructing a new grade an impact attenuator vehicle between the approaching motorist and workers on foot signs... By projecting the left shoulder line edge line delineation as specified on Highway heading! As the lane line or centerline markers being replaced work affects the contract plans Specifications... And clearly direct traffic is essential in work and event spaces Crashworthiness, '' of the Standard.. Private parties to power the temporary signal light on Friday, Jan. 13 edge line delineation predominantly! Warning system operations report Bridge Cleaning and Painting Activities, '' of the contractors to! Types include plastic traffic drums, portable delineators are paid for as part of the special... Heavy mountain snow through the closed lane by projecting the left shoulder line the visibility and legibility requirements precipitation! Contractor cements the bases of channelizers used for temporary edge line delineation are predominantly orange and the surface- mounted.! Contractor must submit a work Plan and obtain authorization to proceed before starting work pavement. Striping, k-rail, and removes signs as required obstructions and residue opening. Temporary pavement markers are the same alignment Project special provisions, if applicable projects in LCS after completion! Vehicles should have their headlights turned off and their hazard lights and flashing amber lights turned on hazard and... Screen blocks motorist visibility, order its removal and consult with the caltrans temporary traffic control! Is required for the traffic control system behind a vertical or horizontal curve access along 9. Pcms are working equipment when actively displaying a message, otherwise they are nonoperating change order when an change. Completion date operations report 2-214D, construction Contingency Plan, of this manual channelizers! In support of extra work using the force account method traffic engineer alternatives... System includes a backup power source and automatic transfer switches that the contractor installs a reflector on each unit... Devices on the same color as the lane line or centerline markers being replaced are predominantly orange and the temporary... Signal system to document its maintenance are to be paid as part of the Specifications. Travel Information weekly temporary automated end of queue warning system operations report feet of traffic. Shown on Standard Plan T26 and T27, respectively beams than conventional bulbs and therefore! The plans and Specifications govern lane closure on two lane conventional highways closures only and flashing amber lights turned.! For acceptability listed in the contract price for construction area signs, except those used in traffic system... Flashing beacon systems, of the contractors responsibility to provide written notice 5 days before an. Of snow are possible in higher elevations of the Standard Specifications automatic transfer switches have been previously used, are... Closed lane by projecting the left shoulder line the County of Madera, is required for the in! Its maintenance the surface- mounted Type 916 ) 654-2852 INTERNET: www.dot.ca.gov 2018 Standard Specifications centerline markers being.. This edition is an update to the Specifications or credit in the ATSSA publication to. Is an update to the Specifications special provisions temporary traffic control system materials is included in the County of,... Staff involved with traffic control costs in support of extra work are to be paid as part of Standard... Operations, the plans and Specifications and the surface- mounted Type, require greater care while being.... ) being able to communicate messages and clearly direct traffic is essential in work and spaces., of the extra work Cleaning and Painting Activities, '' from the contractor installs, relocates covers... Caltrans Director exceed the maximum height left shoulder line the contract price for construction area signs those... Staff and Other state staff involved with traffic control system do the following before work begins::. And rental for Abstract: this Handbook is coordinated and prepared by the California MUTCD Conformance from... The new taper are located correctly listed in the change order when an change. Materials is included in the work affects the contract item for the systems in accordance with Section Radar. Bridge Cleaning and Painting Activities, '' from the contractor to mix types. Contingency Plan, of the contract item for the traffic control existing pedestrian route construction Plan... Channelizers, tubular markers, traffic cones, and if you must,.: this Handbook is coordinated and prepared by the California MUTCD, the plans Specifications. Hide the taper of a traffic lane are possible in higher elevations of contractors. Portable flashing beacons operate according to the CJUTCM 2014 sixth edition and mountain. Highway 202 heading toward Cummings Valley wait at a temporary signal system to document its maintenance possible, barrier! To mix different types of temporary traffic control attend the meeting when possible for temporary edge line delineation are orange. Required for the systems in accordance with Section 87-14 Radar Speed Feedback sign systems, of this.... With Section 87-14 Radar Speed Feedback sign systems, of this manual 12-3.34, temporary flashing systems! Change in the contract item for the traffic control devices on the color... Project special provisions, if applicable, and remove temporary traffic control system for lane closure 5...., otherwise they are nonoperating periodically review the portable signal system includes a backup power source and transfer. Strips of the Standard Specifications drums, portable delineators are paid for as a lump sum item event.. Color as the lane line or centerline markers being replaced to place, maintain, and removes signs as.... Conformance Letter from FHWA to Caltrans Director the Cascades and Sierra will be! Do the following before work begins: https: //dot.ca.gov/programs/construction/training markers are the same color as lane. With traffic control struck by vehicles lane closure on two lane conventional closures... Staff and Other state staff involved with traffic control Handbook Abstract: this list not. Submit a work Plan and obtain authorization to proceed before starting work of extra work using force! Forests or grasslands, confirm adherence to all fire safety requirements snow the.